COMPLETED PROJECTS


Lockheed-Martin Corporation
(Lockheed Missiles & Space Company, Inc.)
1111 Lockheed Way, Sunnyvale, CA

B/102 Area 101 Office Modifications
B/105 Exhaust Fan Installation
B/181 Credit Union Relocation / Parking Lot Mods
B/106 Emergency Generator
B/151 Simulation Lab.
B/104 ADA
B/106 GP/PDC
B/109 compressor.F06930
B/153 Crane Inst.
B/154 Marine Syst. Reloc
B/158 HVACmods.F06945
B/186 Substation
B/195A Humidity controls
B/195B
B/202,206 SEEKER
B/205 ADA
B/205 Dock/ADA
B/567 HVAC mods

LKE International
Lockheed - Khrunichev-Energia
San Jose, CA

Applied Materials Corporation
Santa Clara, CA
2151 Mision College 95158
4250 Burton Drive 95xxx
3111 Coronado 95158
3303 Scott Blvd 95145

Amdahl Corporation
Sunnyvale / San Jose, CA
Bldg. H Corridor Glass Doors
Bldg. H Cafeteria Modifications
Bldg. M-4 Remove & Replace Chillers
Bldg. H Executive Dining Room
Bldg. 07 Access Control Card Readers
Bldg. 18 Fitness Center Entry Mods
Bldg. 07 First Floor Exit Doors
Bldg. 34 Exit Study
Bldg. 07
Bldg. 14
Bldg. 15.
Bldg. 15
Bldg. M-3
Bldg. 21
Bldg. A.
Bldg. 17
Amdahl Corp. Library

Global Center
Interior Modifications
Design/Build Project
Joint Venture w/Lyncon Contractors
Sunnyvale, CA

California Board of Equalization
Interior Modifications
Design/Build Project
Joint Venture w/John Wells Contractors
Salinas, CA

Terrasat, Inc.
Interior Modifications
Morgan Hill, CA

Exodus Corporation
Interior Modifications
Joint Venture with Datasphere, Inc

A.M.D. Corporation
Sunnyvale, CA
A.M.D. KEYSHOP
Haz Mat Enclosure
Parking lot modif.

AIO Microservice, Inc.
Fremont, CA

Boole & Babbage
Tenant Improvements
San Jose, CA

Eater Seals of California
Due Diligence Report
San Jose, CA

PCM
As-built Drawings


Berryessa Union School District
San Jose, CA
Brooktree Arch. Bckgrds.
Brooktree Roof Specs
Brooktree Roof Study
Cherrywood
Northwood Arch. Backgrds
Summerdale Classrooms
Vinci Park

Marshall Builders, General Contractors
Sunnyvale, CA
Interior office layout

Santa Clara County, General Services Administration
Fairoaks Clinic, Sunnyvale

Sun Microsystems, Inc.
2550 Garcia Avenue, Mountain View, CA
41707 Christy St. Fremont, CA

Vinnell Corporation,
Sub-contractor to the U.S. Onizuka Air Force Base, Sunnyvale, CA

Stanford University, Facility Dept.
Palo Alto, CA

Miles Laboratories
Berkeley, CA

Mindanao, Philippines Hydroelectric Plant.
Presentatation drawings and renderings

TAKEZO Women Designers Clothes Store
Valley Fair Mall, San Jose, CA

El Camino Retail Stores
Tenant improvements / commercial building
355 West El Camino Real, Mountain View, CA
Mr. James Ousley

Hacienda Motel Addition
1013 South Front Street, Soledad, CA
Mr. Manuel Lopez

Hacienda Mini-Storage
1013 South Front Street, Soledad, CA
Mr. Manuel Lopez

Moorepark Square Condominiums
San Jose, CA

The Valley Church
Library Modifications, Building #2
10885 N. Stelling Road, Cupertino, CA
Client Contact: Mr. R. Kelsey

Pacific Rim Properties
San Jose, CA

Scoop-it-Up Ice Cream Shop
San Jose, CA

Golden Rose Restaurant
Sunnyvale, CA

SALAS O'BRIEN ENGINEERS, INC.
305 South 11th Street
San Jose, CA 95112-2218
Attention: Mr. Carl E. Salas, P.E., CDSM
Interior office remodeling

Zavala's Mini Storage
San Jose, CA


RESIDENTIAL PROJECTS




Keith Koketsu Residence

1852 Kirkland Avenue
San Jose, CA

Mr. & Mrs. Jim Westenberger
Residence
Palo Alto, CA

Tarazawa Residence
Henry and Matsuno Tarasawa
1748 Brooks Street
San Mateo, California 94403

Heinz Eichenseer
Heinz Eichenseer Engineering
1448 Buckthorn Way
San Jose, CA 95129-3760
P.O. Box 2364
16725 Paskenta Road
Flournoy, CA 96029

Lori H. Hyer Residence
331 Carmelita Drive
Mountain View, CA 94040

Debbie Spencley Residence
732 Sierra Vista
Mountain View, CA 94043

Mr. & Mrs. Werling Residence
Christa & Robert Werling
2847 Gazelle Drive
San Jose, California

Arthur A. Saldivar Residence
1127 Grimly Lane
San Jose, CA 95120

Doreen Lewallen Residence
409 Manzanita Avenue
Corte Madera, CA 94925

Raymond L. Spear Residence
748 Alice Avenue
Mountain View, CA 94041

Michael Cavey Residence
19432 Garrison Avenue
Castro Valley, CA 94546


Major Lockheed Projects Designed by Fernando Camargo, Architect


B/104 - Second Floor Modifications for the "FEWS" Program.
Total Construction Cost: $5.7 Millions

B/104 - Relocate Advanced Space Programs from B/571.
Total Construction Cost: $ 405,000

B/142 - New Shipping & Receiving Building for LMSC Transportation
Total Construction Cost: $ 2.1 Millions

B/150 - Develop IRIDIUM Facility - Desk & Board Office areas.
Total Construction Cost: $ 600,000

B/150 - Develop IRIDIUM Facility - PIC Room, Televideo Conference Room & Corridor Upgrade.
Total Construction Cost: $ 700,000

B/151 - LMSC's first class-100 clean room & support areas for SSD (Space System Division) Microelectronics.
Total Construction Cost: $900,000

B/151 - 3-Hour occupancy separation wall
Total Construction Cost: $ 350,000

B/151 - Fire rated corridor up-grade (Three-year construction master plan)
Total Construction Cost: $ 1.8 Millions

B/152 - Special reprographics & photo developing areas
Total Construction Cost: $ 350,000

B/152 - Autoclave Refurbishment.
Total Construction Cost: $ 250,000

B/153 - Exterior paint scheme for entire building.
Total Construction Cost: $ 200,000

B/154 - Missile Data Center
This project consisted off various computer rooms, a 100-fixed seat auditorium, missiles flight simulation film lab & dark rooms, open desk and board areas, illuminated with an experimental & newly devised lighting concept.
Total Construction Cost: $2.8 Millions

B/159C - Modifications to former chemical milling pit area (south end of bldg.)
Total Construction Cost: $ 1.8 Millions

B/509 - Entire Building Renovation (2 stories)
Total Construction Cost: $2.5 Millions


Major Lockheed Projects:
Design Management performed by Fernando Camargo, Architect


B/107 - Building Main entry design study.
Ehrlich-Rominger Architects
Total Construction Cost: $ 450,000

B/108 - Proposed new building design study.
Ehrlich-Rominger Architects
Total Construction Cost: $ 12.0 Millions

B/157 - Literium Light Shelves
Study by Leo A. Daly Architects
Designed by WHL-Architects
Total Construction Cost: $ 1.2 Millions

B/159C - New addition to bldg. 159
Total Construction Cost: $ 6.8 Millions

B/190 - New Sub-station Building
Designed by ALFA TECH Bouillon
Total Construction Cost: $ 1.3 Millions

B/562 - Construct New Medical Facility for LMSC
Designed by deTienne & Assoc. Architects
Total Construction Cost: $ 2.5 Millions

B/558 - Tenant improvement for entire building (Design & Build)
Designed by Dennis Kobza
Total Construction Cost: $ 950,000

B/561 - Modifications to secured Hi-bay area
Designed by B. C. & S.
Total Construction Cost: $ 75,000


Major Lockheed Missiles & Space Company, Inc., Projects:
Designed By Nicole Lynn Kucera


B/150 - IRIDIUM "Commercial Business"
Remodel an existing 7,000 square foot Desk and Board area. The major features of this project
includes new lobby , convert an existing computer room to a Conference Room and Presentation
Room, Haworth "Places" partition system, new sun screen for exterior window wall and Miscellaneous ADA work.
Total Construction Costs: $ 870,000

B/152 - Relocate Computer Facility from B/555
Remodel an existing 6,000 square foot Desk and Board area for a new Computer Room. The
major features of this project includes new 24" high access floor system, new acoustical wall
covering, construct Generator Room for relocated Generators, new CO2 fire protection system
below the new access floor and Miscellaneous ADA work.
Total Construction Costs: $ 1.4 million

B/104 - Renovate West Mezzanine for P-531
Remodel an existing 20,000 square foot Desk and Board area. The major features of this project
includes new program lobby , construct ceiling high wall offices, upgrade existing offices to 50
STC sound rating, new Overly doors for the security perimeter, new T-Bar ceiling hung from a
unistrut support system.
Total Construction Costs: $ 2.3 million

B/104 - Renovate East Mezzanine for P-531
Remodel an existing 25,000 square foot Desk and Board area. The major features of this project
includes , construct ceiling high wall offices, new T-Bar ceiling hung from a unistrut support
system, (3) new Coffee Rooms,(2) A-2 occupancy Conference Rooms with new corridor system,
major remodel of the existing Men's and Women's restrooms, furr out existing exterior walls,
upgrade (5) existing fan houses.
Total Construction Costs: $ 3.0 million

B/103 - Relocate Machine Shop to B/103
Remodel an existing 10,000 square foot Manufacturing area. This project was
LMSC's first Design/Build project with in-house design and LMSC Construction Services. The
major features of this project includes the relocation of approximately (20) pieces of machinery
within B/103, and prepare an area for (10) pieces of equipment to be relocated from B/182.
Total Construction Costs: $ 111,000


Major Lockheed Missiles & Space Company, Inc., Projects:
Design Management performed By Nicole Lynn Kucera


B/103 - Relocate WP-02 from B/556
The scope of this project includes the construction of a class 100,000 clean room, with dedicated
HVAC system.
A&E: Gordon-Prill
Contractor: Gordon-Prill
Total Construction Costs: $ 484,000

B/151 - Expand Electronic Test Facility
Remodel an existing 20,000 square foot Manufacturing area. The scope of this project was to
expand the existing Electronic Test Facility into an abandoned desk and Board area, upgrade the
existing areas with new T-Bar ceiling, epoxy flooring with copper grounding grid, consolidate all
utilities within new utility chases, rework existing house air systems and electrical systems.
A&E: WHL Architects
Contractor: Hathaway
Total Construction Costs: $ 2.6 million

B/203 - NDT Modifications
The major features of this project includes (2) X-Ray rooms, (1) Laser Lab, new 1-Hr. fire rated
corridor, complete restroom upgrade, replace the electrical service, new house air system, roof
screen.
A&E: Gordon-Prill
Contractor: LMSC
Total Construction Costs: $ 3.3 million

B/103 - Vacate Fast Shop for MSD
The major issue of this project was the fast and critical construction schedule. The scope of the
project was to relocate an existing machine shop from a leased building to B/103 with minimal
down time. This project had to resolve the issue that B/103 was a non-complying building. The
City required this project to submit a Master Plan for the removal of the excessive corrosive material
prior to issuance of the building permit for this project.
A&E: CSS Architects
Contractor: Demerick
Total Construction Costs: $ 2.3 million

B/586 - Relocate Marine Systems
The major features of this project includes to convert an existing Desk and Board area into a
Research and Development area with a 60'-0" long thermal chamber and (2) 20 ton gantry cranes.
A&E: WHL Architects
Contractor: Vanderson
Total Construction Costs: $ 111,000

 


E-Mail address: architects@architura.com



Last modified: June 12, 2000